Operator
Over-Confidence As a result, "Its operators felt they were an elite crew and they had become
overconfident."
Also, the evaluation was realized as an electrical test only and it is
thought that the test was under the supervision of the turbine manufacturer and
not the regular operators.
As a result, "The operators did not think carefully enough about the effects
on the reactor."
Furthermore, if the test was not completed with satisfaction at this time
(April 25, 1986), the people would have to be delayed another year for the next
shutdown as the test was scheduled to be done just ahead of a planned reactor
shutdown for regular maintenance.
As a result, "The operators felt under pressure to complete the test this
time."
At Chernobyl-4 (the reactor used in the
test), the surrounding influence did not tend to promote the operators to carry
out a cautious test. The plant was set up as a model of all the RBMK type plants
where reactors were cooled by water and moderated by graphite. This was
considered to be worthy of copying and to be the best.
|